SAE AMS 3075F pdf download.Compound,Corrosion-Preventive Hard Film, Hot Application.
1.1 Form:
This specification covers a stable, nonvolatile, petroleum-base compound in a form suitable for application by dipping at 170 to 210°F (77 to 99 °C).
1.2 Application:
This compound has been used typically for preservation of metal parts, tools, assemblies, and equipment during shipment and storage where a compound readily removable without component damage is required, but usage is not limited to such app’ications.
1.3 Safety – Hazardous Materials:
While the materials, methods, applications, and processes described or referenced in this specification may involve the use of hazardous materials, this specification does not address the hazards which may be Involved in such use. It is the sole responsibility of the user to ensure familiarity with the safe and proper use of any hazardous materials and to take necessary precautionary measures to ensure the health and safety of all personnel involved.
2. APPLICABLE DOCUMENTS:
The issue of the following documents in effect on the date of the purchase order form a part of this specification to the extent specified herein. The supplier may work to a subsequent revision of a document unless a specific document issue is specified. When the referenced document has been canceled and no superseding document has been specified, the last published issue of that document shall apply.
4, QUALITY ASSURANCE PROVISIONS:
4.1 Responsibility for Inspection:
The vendor of compound shall supply all samples for vendors tests and shall be responsible for the performance of all required tests Purchaser reserves the right to sample and to perform any confirmatory testing deemed necessary to ensure that the compound conforms to the requirements of this specification.
4.2 Classification of Tests:
4.2.1 Acceptance Tests: Melting point (3.2.1). application and removability (3.26). wetting properties and low-temperature adhesion (3.2.7), humidity protection (3.2.12), and salt spray protection (3.2.13) are acceptance tests and shall be performed on each lot.
4.2.2 Periodic Tests: Flash point (3.2.2). consistency (3.2.3), non-volatile matter (3.2.4). stability (3.2.5), rosin (3.2.8), acidity (3.2.9), lead sclubility(32.1O), and loss on heating (3.2.11)are periodic tests, and shall be performed at a frequency selected by the vendor unless frequency of testing is specified by purchaser.
4.2.3 Preproduction Tests: All technical requirements are preproduction tests and shall be performed prior to or on the first article shipment of compound to a purchaser, when a change in ingredients and/or processing requires reappoval as in 4.4.2. and when purchaser deems confirmatory testing to be required.
4.3 Sampling and Testing:
Shall be as follows; a lot shall be all compound produced in a single production run from the same batches of raw materials under the same fixed conditions and presented for vendors inspection at one time.
4.3.1 Acceptance Tests: Sufficient compound shall be taken at random from each lot to perform all required tests. The number of determinations for each requirement shall be as specified in the applicable test procedure or. if not specified therein, not less than two.
4.3.2 Sample quantities for periodic and preproduction tests shall be selected at the discretion of the vendor unless otherwise specified by the purchaser.
4.4 Approval:
Compound shall be assigned a name or other alphanumeric code identification traceable to a specific set of ingredients and raw materials, manufacturing processes and sequences, controls and inspection procedures. In the event of any change in ingredients, raw material, manufacturing processes, manufacturing sequences, manufacturing controls or inspection procedures, that name or other coded identification shall also be changed.